Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.


2.4.6 14OCT19


Ticket

Linked

Function

Type

Subject

MT-4595


Sleipner

Story

RAIDO to support NFP 19.5



Description

Release notes

RAIDO to support NFP 19.5. No new functionality.

RAIDO now supports NFP 19.5




Ticket

Linked

Function

Type

Subject

MT-4395


RAIDO Cloud (Web)

Bug

SAP swap did not complete transaction on Roster/shedule as shown in the HR log



Description

Release notes

The below transaction was approved. However looking at the roster it now is only partially complete. Arrows shows the intended end result in the capture below.

Image Added

Bug in SAP award corrected.




Ticket

Linked

Function

Type

Subject

MT-4373


RAIDO Cloud (Web)

Bug

Not possible to delete not active pairing (with cancelled legs, no crew assigned)



Description

Release notes

Steps to reproduce:
1. Take the pairing
2.Unassign all crew (it should be uncovered)
3. Cancel legs from which pairing consists of
4. Delete pairing using "delete" function
Expected result: pairing should be deleted without an issue
Actual result: Pop-up message which doesn't allow to delete pairing appears. Click on "ok" gives nothing

Deletion of a pairing with cancelled legs fixed.




Ticket

Linked

Function

Type

Subject

MT-4127

MT-4597

RAIDO Cloud (Web)

Bug

The rolling out of the pairing which consists of 2 days only created one pairing



Description

Release notes

The pairing which consists of 2 days was rolled out. Result: Only 1 pairing was created, when it should create for a whole period ahead. At the same time, the pairing which consists of 1 day was rolled out fine.

In Earth is possible to rollout the pairing (from 2 days). But somewhy the first legs in rolled out pairing were created with RD 'D', after saving stayed the same, recalculate and refresh was not helpful.

Rollout/copy of pairings in Cloud fixed




Ticket

Linked

Function

Type

Subject

MT-3806

SP-3998


Bug

Demand calculation - value for splittable tasks



Description

Release notes

The demand calculation returns the wrong value for splittable tasks.

 We changed the logic in generating the export files for demands and will use the same syntax currently used for XIMES




Ticket

Linked

Function

Type

Subject

MT-2928

MT-4011

RAIDO Earth

Bug

Roster block disappeared from Gantt after saving updates to it (Earth)



Description

Release notes

Steps to reproduce:
1. Created the Roster block by dragging the legs from the upper part to lower one. Saved.
2. Via roster block 'Edit', changed Name, Crew Complement, Qual and added the Class, clicked 'Ok'. Updated changes were indicated before saving. But after 'Save' modified roster block dissapeared from Gantt.

Roster block edit fixed




Ticket

Linked

Function

Type

Subject

SM-146


System

Bug

Refreshes and claims deadlocking workaround - Send notifications from separate thread pool thread



Description

Release notes

Threding issues may provoke a spontaneous system restarts

Changes implemented.



2.4.5 18SEP19


Ticket

Linked

Function

Type

Subject

MT-4261

SP-4242,MT-4298


Task

Additional Date/Time column adding to Consolidated report


Description

Release notes

Require additional column adding to the end of the  Consolidated Flying Programme which will add a date|time stamp of the latest change to the following data fields:

  • the flight was last modified (leg status, etc)
  • times last modified (estimated, actual, voyage report etc)
  • pax load last modified (booked, actual etc)
  • notes last modified

The report does not have much space in it, so minor alterations to the column widths will probably need to take place. To add as the lowest possible number of characters – DDHHMM, eg. 101313 for 10Sep at 1313 UTC.

Implemented


Ticket

Linked

Function

Type

Subject

MT-4276



Bug

Potential fix to memory leak in Raido Web CrewGanttLegalityCheck

...

Ticket

Linked

Function

Type

Subject

MT-3568


RAIDO Earth

Bug

Vision report clean up


Description

Release notes

Silver want the presentation of some of the information in Vision report to be change

The structure of the report file is changed according to the last comment NTXPD is not a daily value anymore

...